BigRoz Big Roz
How To

How to install gutter guard

If you want to install a gutter guard, you do not necessarily have to be a trained craftsman, because it is easy to install a gutter guard, while observing individual specifications. It is important, however, that sufficient time for the roof gutter installation is planned so that the rain gutter guard can reliably perform its service – namely the roof drainage in the long term.

Necessary tools to install gutter guard

It is not possible to mount a gutter guard with bare hands. Different tools are required. These include a water tank, a hammer, a fine-tooth saw, an electric screwdriver, a measuring tape and cord. Also, pincers and sheet shears should be provided. Also, a few screws and nails are needed.

Tips to install gutter guard

Since you need to install different tools, but also both hands, you need to carry a tool belt where the utensils can be stored practically. Furthermore, it is useful not to realize the project alone. For example, fathers can include their children, because they can also have a hammer, they have fun with it and even learn something else. To buy the best gutter guard you should be very careful because all the gutter guards are not easy to install.

Steps to install gutter guard

These steps are necessary because a gutter guard usually runs underneath the roof tiles become.

Any distances between the roof panels must be measured so that the tiles can be reinstalled correctly. If the roof gutter is to be mounted on a garage or a garden house, it should also be noted that there is usually no roof plate and therefore one must be installed in the appropriate length. Next, the trench iron must be fixed and aligned. The first channel iron is bent along the measured distance between the tile and the roof edge and fastened securely with screws and nails. A pincer should be used to bend the trenches.

The remaining channels can be processed in the same way. Now the guideline comes into play. This is laid across the roof, from the lowest to the highest point of the channel ice. In this case, however, the gradient must be observed, which can be checked with the water balance. Then the string is pulled back again, to the other side of the roof, where the second channel iron has been attached. If the slope is always in the eye, then the remaining trenches can be stretched between them. Attaching the gutter guard with all the brackets are mounted, only then the gutter has to be used.

How this serves, depends on the nature of the gutter guard and the other hand from the manufacturer specifications. Thus, the individual elements of the gutter guard have to be accurately sawed and laid accordingly. It should always start with a corner piece and end with one. While plastic canopies can be plugged together, metal gutters have to be frequently soldered. This information can be taken from the manufacturer.

Lastly, a leaf grille should be placed in the gutter guard, so that the rain gutter guard is safe from the leaves. The previously removed roof tiles can then be reattached. With these few steps, the gutter has already been installed and from now on responsible for the professional drainage of the house roof.

Leave a Comment

%d bloggers like this: